HomeNewsPhotos

Photos

2015 SELM
A Team Malmstrom member watches with anticipation as a 100-ton launcher closure door slides open during the installation’s Simulated Electronic Launch-Minuteman test at a launch facility April 7. During the test, Airmen form Malmstrom, along with test personnel from the 576th Flight Test Squadron at Vandenberg AFB, California, worked together to perform a successful SELM. (U.S. Air Force/Airman 1st Class Collin Schmidt)

Download Image: Full Size (0.59 MB)
Photo by:  |  VIRIN: 150407-F-GF295-019.JPG