Photos

Keyword: Category: Tag: Sort By:
A member of Malmstrom’s 341st Civil Engineer Squadron snow removal team plows a parking lot after receiving several inches of snow in the days prior to Feb. 3. Vehicles as well as the Airmen at Malmstrom Air Force Base must be ready to perform in any type of weather, including the harsh, bitter 40-degree-below-zero weather conditions that were presented Feb. 5.. (U.S. Air Force photo/Senior Airman Cortney Paxton)


winter working

A member of Malmstrom’s 341st Civil Engineer Squadron snow removal team plows a parking lot after receiving several inches of snow in the days prior to Feb. 3. Vehicles as well as the Airmen at Malmstrom Air Force Base must be ready to perform in any type of weather, including the harsh, bitter 40-degree-below-zero weather conditions that were presented Feb. 5.. (U.S. Air Force photo/Senior Airman Cortney Paxton)

Related Imagery